|
Updated: 11/23/2006 |
|
CON-051 |
| ||
|---|---|---|---|---|---|
| Previous CON | RGHQ-51 Home Page | CON Reports Listings | DSTL Reports Listings | Ops Listings | Gate ID Chart | Next CON |
|---|
| Mission 1 |
|---|
Gatewatch Report
Consistent with the continuing apparent erratic behaviour of the Gate, we have detected a series of signal spikes, somewhat more in advance than has to date been possible. We are expecting that on the day the strength will be very high. Quite what this will mean for the Gate, the base and any potential flight crews is at this time unknown.
The potential activations are for the period 05/03/05 (circa 09:00-19:00).
All of the signals remain at this time unresolved in terms of their precise times, however the destination is quite clear.
| Target |
|---|
| X C 0 6 0 A |
This target was the subject of an earlier operation CON-23 "Operation Stanford Bridge" on 12/19/1999.
This behaviour remains “consistent” within the parameters of recent observations, as the Gate system is continuing to exhibit untypical behaviour, as per CONTACT’S 39-50, with rough and unpredictable flight experiences for crews expected as before. Gatewatch 50, 52 and 54 are, in advance of the next cycle for CON-52, all reporting similarly increased advanced activity, but unlike ours, with few resolved signal spikes. There is still no data from Star Gate-53 for comparison at this time, as the French report that their base remains off-line.
Maps were available at CON-051, images added here on 03/09/2007
| General | |
|---|---|
| 1 Clarke. Stephen. (ACMO)* 2 Evans. Stephen.(S2) 3 Parker. Susan. 4 Pollard. Ashley R. *Acting Chief Medical Officer |
5 Rushen. Clive. 6 Smith. Trevor. 7 Wayland. Dean C.(S1) 8 Worsfold. Graham. |
|
|
|
End of Page